BP begins 'top kill' bid to stem flow
Found on BBC News on Tuesday, 25 May 2010
BP says it has begun pumping mud into a breached Gulf of Mexico oil well to try to stem the flow of oil caused by a rig explosion last month.
If the oil flow is successfully capped, engineers will follow up with cement to seal the well permanently.
There is a risk a weak spot in the blowout preventer that sits on top of the well could breach under the pressure, causing a brand new leak at the site 50 miles (80km) off the Louisiana coast.
I'm amazed seeing all that accumulation of fail in the oil business.